Hashmoto Y, Tsubota Y, Nakano Y, Urabe W, Hazama Y, Yanagihara S, Oka T
Year:
2002
Bibliographic info:
Proceedings of Room Vent 2002 (8th International Conference on Air Distribution in Rooms) - 8-11 september 2002 - Moltke's palace, Copenhagen - Denmark - pp 177-180, 5 figs, 4 Tabs., 5 ref.

Experioments has been conducted with a ice thermal storage and a ceiling plenum. This ductless air supply system can be an alternative to the use of chilled water tubes. This system supplies air to the ceiling plenum chamber by mixing return air and low temperature air.