Submitted by Maria.Kapsalaki on Mon, 11/16/2015 - 16:46
In 2014 the first multi storey residential building planned and constructed to meet the Passivhaus Institute (Darmstadt) criteria was put in operation in Ljubljana, the capital of Slovenia. This massive-structure building is part of the FP7 EE-Highrise project, aiming to demonstrate nearly zero energy building (nZEB) technologies, an integrated design concept, and advanced systems for sustainable construction.
Submitted by Maria.Kapsalaki on Mon, 11/16/2015 - 15:36
The 36th AIVC Conference " Effective ventilation in high performance buildings", was held in Madrid, Spain, 23-24 September 2015. Contains 119 papers and extended summaries.