Yanagihara, R.; Kawano, M.
Year:
2008
Bibliographic info:
29th AIVC Conference " Advanced building ventilation and environmental technology for addressing climate change issues", Kyoto, Japan, 14-16 October 2008

Tokyo Electric Power Company R&D Center wascompleted in September 1994. The buildingsconstructed in Phase I (hereinafter just called "thebuildings") were conferred the 35th Annual Awardsby the Society of Heating, Air-Conditioning, andSanitary Engineers of Japan (SHASE). The awardwas given to commend the 30% (approx.) energysavings attained by the adoption of the cold airdistribution system and various other techniques andtechnologies for energy conservation and operationmanagement. Tokyo Electric Power Company R&DCenter has undertaken a wide range of buildingcommissioning including building management sincethe completion of the construction. Now that adecade has passed since the completion, the R&DCenter has enhanced the energy-saving performancewell beyond the levels previously awarded.