Thermal comfort in indoor and outdoor transitional spaces of buildings in Bangkok.

Thermal comfort in transitional spaces of buildings is established from a field study conducted in the cool season of Bangkok, Thailand. IL involved 302 indoor subjects occupying either air-conditioned or naturally ventilated environments and 291 outdoor subjects who were leaving the indoors. The data were analysed by using a calculating method, "Griffiths" values, giving neutral temperatures, and a quadratic regression for thermal acceptability.

The simulation of adaptable components in the external envelope of a building.

This paper considers the building's envelope in the design phase. Energy related decisions during the design phase have great influence on the life cycle cost of the building. Since sunlight and climate are changing factors, the envelope is equipped with mobile and adaptable components (shading devices, movable insulation, opening window schedules ...) which can react to climatic conditions. Architects use computer aided design tools to describe a building and its envelope.

Use of ventilated envelopes in building retrofitting.

The application of a continuous thermal insulation on the external face of building walls ameliorates the thermal performance of external walls and alleviates problems related to thermal bridges. However a further improvement of this insulation system may be achieved by using ventilated walls, which consist of an open ended cavity placed between an insulating board {directly applied on the external side of outer walls) and an external cladding.

Bioclimatic design strategies in temperate climate. Consistency of passive cooling and heating.

In the temperate climate, the consistency of bioclimatic designs for heating and cooling is essential. However, the traditional Japanese houses which have excellent cooling techniques often disclose their poor thermal performance in the winter time. Since Jong it has been said that they sacrificed the heating performance in return for the cooling performance, as a result of their choice in the time when the consistency was technically impossible.

Monitoring indoor climate in a medieval castle.

                

CCB - VKB: refurbishment of an existing office building designed to reduce its energy consumption below 100 kWh/m2 per year.

Samyn & Partners conceived with the studies of the Belgian Building Research Institute, the refurbishment of an existing office building in one of the most polluted avenues in Brussels. Designed to save maximum energy, the building meets all modem comfort standards, respects the environment and creates attractive and enjoyable working space.

Thermal performance of a passive-designed dwelling unit and the influence of residents' dwelling condition.

Passive and low energy houses are not yet widespread throughout the world. One of the reasons is that their actual performance has not been clarified. In recent years, the number of houses has been increasing in Japan, however, there are very few examples of multiple dwelling building whose performance has been clarified. The annual thermal performance of two dwelling units in a multiple dwelling building in Japan is measured and their high performance is verified.

Integrated solar thermal upgrading of multi-storey housing blocks in Glasgow.

This paper will describe a proposal to upgrade a thermally sub-standard multi-storey housing block (Type T84), where height and climatic exposure are significant, to demonstrate the effectiveness of passive, active and hybrid solar techniques to minimise space and water heating loads while enhancing the quality of air in both shared and private spaces.

Retrofit of existing housing stock. A feasibility case study.

lsrael not unlike other Mediterranean country , experienced a housing construction boom in the 1950s and 1960s. Many projects from that period are currently undergoing renovation and refurbishment. This study reviewed the thermal characteristics of such projects and evaluated the current refurbishment practices vis-a- vis a combined effort including retrofit. Different solutions for a specific case study were evaluated.

Pages