Bioaerosols.

Demonstration of full height basement insulation construction methods.

In the summer of 1991 Buchan, Lawton, Parent Ltd. was issued a contract by the Ontario Home Builders' Association Steering Committee on Full Height Basement Insulation (FHBI) with representation from Canada Mortgage and Housing Corporation, Canadian Portland Cement Association, Ontario Ministries of Energy and Housing, Low Rise Forming Contractors' Association, Ontario Concrete Block Association, Ontario New Home Warranty Program, and The Society of the Plastics Industry of Canada, to carry out a demonstration of FHBI construction methods.

IEA-ECBCS Annex 17 Final Report. Simulation Exercises A.2 Residential Heating System - Appendix.

This represents the appendix to NO 9406, which is the synthesis report on two reference simulation exercises, both dealing with a hydronic heating system. In the first exercise the heating system is installed within a residential building and in the second exercise the same heating system is installed in an office building.

IEA-ECBCS Annex 17, Final Report. Simulation Exercises A.2 (Residential Heating System).

This document is the synthesis report on two reference simulation exercises, both dealing with a hydronic heating system. In the first exercise the heating system is installed within a residential building and in the second exercise the same heating system is installed in an office building.

Pages