Airtightness of a multi-family passive residential building in the Czech Republic

During the construction of a multi-family residential building the developer decided that the building must comply with the airtightness requirements for passive houses. Based on inspection work and preliminary testing, the original design was revised. The execution of the new air barrier system was supervised. Selected flats were repeatedly tested during the construction process. The whole building was tested once before the completion of the construction. After the completion of the building, all the flats, the whole building and the staircase were tested again.