Challenges and limitations of performance based approaches: the Belgian experience

Performance based approached for ventilation started to be used in Belgium in 2008 in the context of EP regulation. Until 2015, demand controlled ventilation (DCV) systems were considered as “innovative” products and were not directly taken into account in the EP calculation method. Their energy performance was then considered through a principle of equivalency. A first performance based approach was developed in this frame.