Airtightness of buildings – Considerations regarding place and nature of pressure taps

This paper discusses two particular points of the buildings airtightness measurement method (ISO 9972) in relation with the pressure difference: (1) the nature of the pressure tap and (2) the place of the pressure tap outside. 

Airtightness of Buildings – Considerations regarding the Zero-Flow Pressure and the Weighted Line of Organic Correlation

This paper discusses two particular points of the buildings airtightness measurement method (ISO 9972) in relation with the calculation of the combined standard uncertainty: (1) the zero-flow pressure difference and (2) the weighted line of organic correlation.

Belgian framework for reliable fan pressurization tests for buildings

This paper presents the new framework for the realization of reliable pressurization tests in Belgium and the provisions taken to widen the number of buildings where a valid pressurization test can be realized.

The 10 steps to conceive and build airtight buildings

Airtightness becomes a more and more important parameter in the rationalization of the energy consumption.  The quality of the works during the construction process is essential. However, this particular step is on itself absolutely not sufficient to build airtight buildings. Airtightness has to be taken into account from the pre-project. For that, architects have to deal with a large bunch of items. Steps as the definition of the ambition level, the precise positioning of the airtightness barrier into the building are essential.